My Christmas Layout - 2007
The Patapsco Valley Railroad
Click on thumbnail to see larger picture.  Press Back Arrow to Return
These pictures were taken
during the 2007 Christmas   
This year I decided to make a
layout instead of putting the
track on the carpet.    The
modules allows me to hide the
wiring and to have a place to put
the Department 56 and MTH
buildings.   The layout is a 4X8
which allows the trains to run
around the layout twice.    To
allow for easier storage and
transport into the basement, I  
split into two 4X4 modules.   
bolts keep them together while
on the carpet.   One of the
modules has a hole framed in
the middle of iit allowing the
Christmas Tree base to be on
the floor.