Layout in 2006 - Page 1
The Patapsco Valley Railroad
Click on thumbnail to see larger picture.  Press Back Arrow to Return
These pictures show the
layout in May of 2006
before the basement
remodeling.   This is the
last pictures of the layout
running Realtrax both the
main line, mountain
subdivision and the
yards.  The main line was
a single track with a
passing siding on the
north end of the layout.   
The yard had the 2nd
track as the yard lead
with the switches.   The
yard pictures below were
expanded to
accommodate longer
trains.